The project entails the development and establishment of a 50MW solar photovoltaic power station and construction of a 1×4.3km 132kV Lynx line from the solar plant to an existing 132kV line cut-in point by way of a switching station at the Tee point. The energy from this plant will be fed directly into a national grid. This project is currently at preparation stage.